MIL-PRF-25478D
u.
If the test conditions are other than as specified in section 4 (see 4.4).
v.
Test bench duct dimensional requirement (see 4.4.1).
w.
Oil inlet temperature for test (see 4.6.5).
x.
Packaging requirements (see 5.1).
y.
Data required.
6.3 Guidance for sampling inspection. Samples subjected to the pressure cycles test were
marked to show that the item was overstressed and were not used to fulfill contractual requirements.
6.4 Subject term (key word) listing.
Gas turbine engines
High temperature oil
Petroleum base oil
Piston engines
Synthetic base oil
6.5 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodians:
Preparing Activity:
Air Force - 71
Air Force - 71
(Project 2935-2009-002)
Review Activities:
DLA - GS
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency
of the information above using the ASSIST database at https://assist.dla.mil/.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business